This project for the Wu yang new hope iron smelting limited liability company 1260 m3 blast furnace drum method water slag facilities transformation three electric design and supply works, 1260 m3 blast furnace drum method water slag facilities in the aparty factory area for transformation. The transformation uses the new bottom filtration method Environmental Filtration Process slag treatment process, referred to as the EFP process.
A full set includes the design, procurement, construction, installation, commissioning, thermal load testing, trial operation, completion of functional assessment, personnel training, technical services until completion and acceptance, as well as defect repair, engineering quality assurance during the quality assurance period, warranty obligations of the whole process of the project.
According to the requirements of the production process, considering the principle of advanced technology and reliable performance, an automatic control system is designed in the water slag transformation system to realize the detection of the process parameters of the water slag transformation system and the automatic control of the equipment. Design a set of upper-position machine system, independent of each other, to achieve the relevant production process of online real-time screen monitoring, at the same time, through access to industrial Ethernet composed of the blast furnace LAN network system, to achieve network communication, in the main control room to complete the water slag transformation of all the production process of centralized monitoring.