Zhongke Tianrui company's total package blast furnace coal-spraying three-electric system engineerin

Date: 2019-05-29
Views: 49

中科天瑞公司总包高炉喷煤三电系统工程


The automatic coal injection control system consists of 2 sets of PLC, powdering system: including raw coal silos, flue gas heating furnaces, blast furnace gas pipes, combustion air pipes, hot flue gas pipes, cold air pipes, coke oven gas pipes, medium-speed grinding machines, coal-fired machines, coal powder collectors, powder fans and so on. Second, blowing system: including coal powder warehouse, 4 blowing tanks, gas storage tanks, high-pressure nitrogen pipe, blow-off dispenser.


Graphics software using WCC monitoring software, with real-time monitoring, historical trend charts, reports, fault information, good human-machine interface, rich graphics library, process control function blocks, mathematical functions and other functions.


The monitoring screen in the industrial control machine is combined with the control software in the PLC, which constitutes the total function and characteristics of the automation control system, and replaces the large number of display gauges and button switches on the operator's table with the intuitive dynamic display screen in the color large screen terminal, making the operation control both intuitive and simple.



Projects / Related case More
2019 - 05 - 29
The main process of blast furnace (blast furnace body, hot air furnace, slot material, blast furnace gas dry ingest, circulating pumping station, water slag and its pumping station, iron field dust removal, mine chute dust removal and other processes) adopts the three-electric integrated control scheme of 'dispersed control, centralized monitoring'.The main control system of this scheme is...
2019 - 05 - 29
Ingredient sintering process and sintering process design 1 set of PLC system, control includes fuel crushing, ingredient room feeding transport, one mix, two mix, dust removal valve, mixed material tank, laying bottom groove, roller / nine-roll cloth, sintering machine, single roller crusher, ring cooler, cold ore screening, finished ore transfer, re-mining, bottom transfer material, The main pla...
2019 - 05 - 29
2 The number of thermofurnace body thermocouple installations is 134, a total of 202 points. However, the number of thermocouples installed at the bottom of the furnace and in the furnace area was relatively small, with 66 units, for a total of 134 points. The original design furnace cylinder a week only installed 8 thermocouples, adjacent 2 thermocouples spacing 5.26 meters, up and down the spaci...
2019 - 05 - 29
This project for the Wu yang new hope iron smelting limited liability company 1260 m3 blast furnace drum method water slag facilities transformation three electric design and supply works, 1260 m3 blast furnace drum method water slag facilities in the aparty factory area for transformation. The transformation uses the new bottom filtration method Environmental Filtration Process slag treatment pro...
0
CONTACT

ADDRESS ADD: 5th Floor, Building 3, No.8, Hangfeng Road, Fengtai District, Beijing
EMAIL E-mail:15611195058@163.com
TEL TEL:010-56541668
FAX FAX:010-56541673
  • Subscription
  • Service
Copyright ©2018 - 2020 TANRRY(Beijing) Technology Co., Ltd. 
Rhino Cloud provides enterprise cloud services
X
3

SKYPE 设置

4

阿里旺旺设置

等待加载动态数据...

等待加载动态数据...

5

电话号码管理

  • 010-56541668
6

二维码管理

等待加载动态数据...

等待加载动态数据...

展开